Ross Valley Sanitation
Challenge Replace 200 miles of aging sewer pipe at 5 miles/year over 40 years with predictable costs and reliable ROI, to get rid of I/I spikes in one of the wettest climates on America’s West Coast. Solution We help this …
Challenge Replace 200 miles of aging sewer pipe at 5 miles/year over 40 years with predictable costs and reliable ROI, to get rid of I/I spikes in one of the wettest climates on America’s West Coast. Solution We help this …
Sweet Rewards: new composite cutting blade and hydraulic ram enable us to overcome accessibility challenges Challenge Replace corroded cast iron pipes without disrupting a factory’s production line. Solution Our consultant Ben …
OEM mods allow upsize of 40-foot stretch of sewer pipe beneath busy downtown intersection Challenge Upsize 40 critical feet of 8-inch clay sewer main to 14-inch HDPE beneath a busy downtown intersection, without resorting to …
If It Ain’t Broke, Fix It Anyway Challenge Get out in front of numerous accidents waiting to happen in the 696 miles of sanitary sewer in the Lafayette Utilities System (LUS), which serves 105,000. Solution Among other tasks in …
Innovative pipebursting approach successfully upsizes old trunk sewer line to serve a new Southern California subdivision Challenge Burst a 350-foot-long trunk line, replacing 10-inch clay pipe with 14-inch SDR-17 polyethylene …
Something Old, Something New: New twist on trenchless shows promise for California water company’s ability to avoid costly permitting process Challenge Burst and remove 3,000 feet of galvanized steel transmission line without …